Go top
Project information

Active management of demand

L. Rouco E. Lobato F.M. Echavarren A. González

July 2007 - December 2009

Funding entity REE (Red Eléctrica de España)


The aim of this project is the development of work package 1.3 «Network Analysis» for Red Electrica de España within Cenit-GAD project. The purpose of this work package is the development of methods to incorporate the active management of demand into the short-term planning and operation of the transmission network.


REE-GAD